Friday, 8 November 2019

Newton Marina works, 2019 - NaBloPoMo #8

Over the past seven months, I've watched with interest how the derelict foreshore of Goat Island is being transformed into a marina. A huge amount, 44,000 tons, of aggregate has been dumped on the place, and a substantial amount of land was reclaimed from the sea. The basin in which the boats will eventually be moored was dredged out using a method with bunds. This means that you build a pier of rocks into the sea, then remove the bund again whilst dredging out the sea around it - and from the location where the bund was located. There were seven such bunds, but that work is now complete. Dredging also took place from a barge, moored in the old basin. As I type this, the first of the pontoons is being installed. Once completed, the marina will be able to house 80 yachts. The marina in the Inner Harbour here in Stornoway can house a similar number.

The first of the bunds



Working the bunds



Walking on water in October



Constructing the slipway




State of affairs 8 July



Marine dredging



A sgoth nosing around the works early in September



Constructing the breakwater at sunset in October



Removing the railings along the causeway



Constructing the pontoons, early November



This picture shows the works on 6 November

Wednesday, 19 June 2019

Marina

In the basin across from my position, work has been afoot since the beginning of May to construct a marina. After various wrecks had been removed, hundreds of loads of aggregate (rock) were dumped. These were distributed into so-called bunds - which look like piers - from which a large digger would excavate the surrounding waters. The soil that was dug up is being used to build up a foundation for the marina. This still has got a long time to run, most of this year if not into 2020. Fascinating to watch, and fascinating to assess the effect of the tides. A lot of the bunds and other features currently in existence are submerged at high tide.

P6184227 Construction of cofferdam for slipway
P6184216 Shifting of soil and aggregate for construction and removal of bunds
P6184209 Base for small slipway
P6154130 Scoop
P6154125
P6024007 One bund being removed, another being constructed
P5283931 Demolition of boathouse
P5223829 Warning sign on Goat Island
P5193790 Plant on Goat Island
P5093648 Derelict boathouses
P5093641 P5093640 Safety first
P5093635 Large tubes
P5083598 P5073592
P4303529 The last boat removed from Goat Island
P4303513 Breaking up of the Craignair